高压电缆蛇形敷设相关计算分析
Calculation analysis of serpentine laying of High-voltage Cable
-
摘要: 为避免高压电缆运行中轴向力和电动力对电缆的损伤,以220 kV 2 500 mm2电缆为例,分析计算电缆蛇形敷设时半蛇形节距、蛇形弧幅等参数对轴向力、金属套伸缩应变的影响。经分析可知,蛇形弧幅和半蛇形幅节距对轴向力控制有重要作用。同时,计算了电缆短路时的电动力并进行了电缆夹具布置的校验,通过设置合理的蛇形敷设参数,可以有效吸收由轴向力带来的形变。本文可为电缆蛇形敷设和校验提供参考。Abstract: In order to avoid the damage caused by axial force and electrodynamic force during operation of high-voltage cable, taking 220 kV 2 500 mm2 cable as an example, analyzed and calculated the influence of parameters such as half-serpentine pitch and serpentine arc amplitude on axial force and expansion strain of metal sheath during the serpentine laying of cable. The analysis showed that the pitch of serpentine laying arc and the pitch of the half serpentine laying arc play an important role in controlling axial force. At the same time, electrodynamic force of cable in short circuit was calculated and cable clamp arrangement was verified. By setting reasonable snaking laying parameters, the deformation caused by axial force could be effectively absorbed. This paper could provide reference for cable serpentine laying and verification.
©上海电缆研究所有限公司《电线电缆》编辑部版权所有,未经授权不得转载、改编。